Inspired its peers,
Turkey's first patented concrete finisher

With its young and dynamic team, Mimyap provides turnkey project design and contracting services in addition to manufacturing.

A dam is a large structure built to collect or store flowing water from a river in order to provide drinking and irrigation water or to generate electricity.

  • Concrete Dams

    • Gravity dams
    • Arch dams
    • Cylindrical concrete dams (CCD)
    • Buttress dams

    Gravity dams are dams that withstand design loads with the weight of their own bodies.

  • Embankment Dams

    • Clay-core rock-fill dams
    • Concrete-faced dams
    • Membrane-faced dams

    The most important issues in embankment dams are impermeability and strength. The most common method in our country is to ensure impermeability by applying a clay core to the dam body. They are less costly than concrete dams.

  • Concrete-Faced Rock-Fill Dams

    Concrete-faced rock-fill dams (CFRD) are rock-fill or gravel-fill dams with a concrete layer on the upstream face to provide impermeability, without a clay core.

Front Side Concrete-Faced Dams
  • Why concrete-faced rockfill dams?

    • Lower cost
    • Faster construction
    • When clay material is not available near the dam site
    • Earthquake resistant
    • All types of permeable and semi-permeable materials can be used

    It is adjusted according to the concrete top elevation and the concrete is poured according to this elevation.

Finisher with Concrete Pouring

The finishing screed is 2 meters long and 15 meters wide. Its width is adjusted according to the main width. The finishing screed has three functions in concrete pouring.

  • It is adjusted according to the concrete top level and pours the concrete according to this level.
  • Performing the finishing process on self-compacting concrete.
  • On a sloped surface, it acts as a formwork until the concrete loses its fluidity and gains its durability, and is then slowly pulled upward. For this reason, the concrete pouring speed for finishes is slow.
Finisher Technical Specifications